Skip to main content
Metapanel
AR
SYS

System details.

Details communicate joint and closure principles; the project designer must approve the final solution.

03
Document sets
Historical referencePDF

Archived roof ventilation details

Preserved preliminary details for coordination; the project designer approves the final solution.

Historical referencePDF

Archived façade drip detail

Historical detailing principle, not an approved construction drawing.

Current verification required

Cold-room details

Wall, ceiling and floor junctions with thermal-bridge control.